MIL-R-8592/3
STANDARDS
Military
Sampling Procedures and Tables for
MIL-STD-105
Inspection by Attributes
Marking for Shipment and Storage
MIL-STD-129
Snap, Parachute Harness Quick Fit
MS22018
Ejector
Ring - Parachute Harness "v"
MS22045
Survivors Sling, Rescue
MS90380
(Copies of specifications, standards and drawings required by suppliers
in connection with specific procurement functions should be obtained from
the procuring activity or as directed. by the contracting officer. )
REQUIREMENTS
3.
Preproduction - The survivors sling furnished under this
3.1
specification shall be a product which has been tested and passed the pre-
production inspection specified herein.
Materials - All material shall be as specified on MS90380.
3.2
Protective treatment - When materials are used in the construc-
3.2.1
tion of the survivors sling that are subject to deterioration when exposed
to environmental conditions, likely to occur during service usage, they
shall be treated against such deterioration in such a manner that will in
no way prevent compliance with the performance requirements of this speci-
Protective coating which might crack, chip or scale during normal
fication.
service life or under extremes of environmental conditions shall not be used.
Fungus proof materials - Materials which are nutrients
3.2.2
Where
for fungi shall not be used where it is practicable to avoid them.
used they shall be treated with a fungicidal agent acceptable to the pro-
curing activity.
Design- The survivors sling shall be designed in accordance
3.3
with MS90380.
Performance -
3.4
Proof load - The survivors sling shall exhibit no evidence
3.4.1
of damage, separation of the stitching, failure of the hardware, nor deforma-
tion of any part when tested as specified in Section 4.
M a r k i n g The following information shall be marked on
3.5
the survivors sling in a durable and legible manner.
2
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business