MIL-C-10082C(MU)
3.3 Airflow resistance. The airflow resistance of the assembled canister,
measured os pressure differential, shalI not exceed 65 milIimeters of water at
a flowrate of 85 Iiters per minute when tested as specified in 4.6.1.
3.4 Dioctylphthalate (DOP) smoke penetration. The canister shalI not
show a DOP smoke penetration of more than 0.001 percent at a flowrate of
32 liters per minute when tested as specified in 4.6.2.
3.5 Airflow resistance and DOP penetration after rough harding. After
rough handling for five minutes as specified in 4.6.3, the canister shalI con-
form to the requirements specified in 3.3 and 3.4.
3.6 Leakage. The assembled canister shall not leak more than 5 milIiliters
per minute when subjected to an internal air pressure of 5.5 pounds per square
inch gage when tested as specified in 4.6.4.
3.7 Preproduction. When specified in the contract or order, a preproduction
sample shalI be produced for examination and test. The preproduction sample
shalI be manufactured using the same materials, methods and equipment as wilI
be used during regular production (see 6.2).
3.8 Workmanship. The canister shalI be free from damage (dents, bum,
crocks, or deformations) and foreign matter (dirt, grease, oil, or viscous
material).
4 . QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection. Unless otherwise specified in the contract
or purchase order, the supplier is responsible for the performance of alI inspec-
tion requirements as specified herein. Except as otherwise specified, the
supplier may utilize his own facilities or any commercial Iaboratory acceptable
to the Government. The Government reserves the right to perform any of the
inspections set forth in the specification where such inspections are deemed
necessary to assure supplies and services conform to prescribed requirements.
4.2 Special provisions.
4.201 Alternative inspection. The supplier may utiIize any alternative
inspection procedure which will provide equal or better assurance of quality
by submitting a written proposal with justification and obtaining written
approval from the Government prior to instituting the procedure. In case of
dispute, the procedures of this specification wilI govern.
3
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business