MIL --- DTL --- 51170G(EA)
however, supersedes applicable laws and regulations unless a specific exemption has been ob-
tained.
3. REQUIREMENTS
3.1 First article. When specified (see 6.2), a sample shall be subjected to first article inspec-
tion in accordance with 4.2.
3.2 Design and construction.
3.2.1 Materials. All materials cited on Drawing 5 --- 75 --- 2 and its subsidiary drawings shall
conform to the specifications listed thereon or to the specific characteristics set forth on the
drawings.
3.2.2 Manufacture and assembly. The M1 bag (waterproof bag in a pouch) shall be
manufactured and assembled as shown on Drawing 5 --- 75 --- 2 and subsidiary drawings.
3.3 Waterproof bag (Drawing 5 --- 75 --- 3).
3.3.1 Leak integrity. The waterproof bag shall not leak when filled to a depth of 15 inches
of water for 15 minutes.
3.3.2 Seam strength. The bag seams shall withstand a pull of not less than 3.0 pounds.
3.3.3 Marking. Marking shall be as specified on Drawing 5 --- 75 --- 3 and shall remain legible
after being exposed to water.
3.3.4 Resistance to low temperature. The waterproof bag material shall meet the cold crack-
ing requirement of Drawing 5 --- 75 --- 3 after exposure to low temperature.
3.4 Workmanship. The M1 bag shall be free from damage (cuts, tears, abrasions, or punc-
tures) and contamination (dirt, grease, or oil). The seams shall be uniform, continuous, and free
from wrinkles and bubbles.
4. VERIFICATION
4.1 Classification of inspections. The inspection requirements specified herein are classi-
fied as follows:
(a) First article inspection (see 4.2)
(b) Conformance inspection (see 4.3)
3
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business