MIL --- DTL --- 51400A(EA)
however, supersedes applicable laws and regulations unless a specific exemption has been ob-
tained.
3. REQUIREMENTS
3.1 First article. When specified (see 6.2), a sample shall be subjected to first article inspec-
tion in accordance with 4.2.
3.2 Design and construction.
3.2.1 Materials. All materials cited on Drawing 5 --- 75 --- 13, Drawing 5 --- 75 --- 17, and subsi-
diary drawings shall conform to the specifications listed thereon or to the specific characteristics
set forth on the drawings.
3.2.2 Manufacture and assembly. The M1A1 bag and the retainer bag shall be manufac-
tured and assembled as shown on Drawing 5 --- 75 --- 13 and Drawing 5 --- 75 --- 17, respectively, and
subsidiary drawings.
3.3 Waterproof bag (Drawing 5 --- 75 --- 13).
3.3.1 Leak integrity. The waterproof bag shall not leak when filled to a depth of 12 inches
of water for 15 minutes.
3.3.2 Seam strength. The bag seams shall withstand a pull of not less than 3.0 pounds.
3.3.3 Marking. Marking shall be as specified on Drawing 5 --- 75 --- 13 and shall remain legible
after being exposed to water.
3.3.4 Resistance to low temperature. The waterproof bag material shall meet the cold crack-
ing requirement of Drawing 5 --- 75 --- 13 after exposure to low temperature.
3.4 Workmanship. The M1A1 bag shall be free from damage (cuts, tears, abrasions, or
punctures) and foreign matter (dirt, grease, or oil). The seams shall be uniform, continuous,
and free from wrinkles and bubbles.
4. VERIFICATION
4.1 Classification of inspections. The inspection requirements specified herein are classi-
fied as follows:
(a) First article inspection (see 4.2)
(b) Conformance inspection (see 4.3)
3
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business