MIL --- DTL --- 51222E(EA)
ATTN: AMSRD --- ECB --- ENT --- E, Building E5165, Aberdeen Proving Ground, MD
21010 --- 5424.
6.6 Submission of alternative inspection provisions. Proposed alternative inspection provi-
sions should be submitted by the contractor to the procuring contracting officer for evaluation
and approval by the technical activity responsible for preparation of this specification.
6.7 Detectors. Information on suitable detection instruments for R --- 134 refrigerant and
DMMP may be obtained from Edgewood Chemical Biological Center, AMSRD --- ECB ---
ENT --- E, Bldg. E5165, Aberdeen Proving Ground, Maryland 21010 --- 5424.
6.8 Lot size. A lot size of less than 50 should be avoided if possible to prevent more than 10
percent of the lot from being destroyed during DMMP life testing.
6.9 Subject term (key word) listing.
Air purifier
CK (cyanogen chloride)
DMMP
Filtered air
R --- 134a (1,1,1,2 tetrafluoroethane)
Toxic gas filter
6.10 Changes from previous issues. Marginal notations are not used in this revision to iden-
tify changes with respect to the previous issue due to the extent of the changes.
Preparing activity:
Army
---
EA
Project No. 4240 --- 2008 --- 005
NOTE: The activities listed above were interested in this document as of the date of this
document. Since organizations and responsibilities can change, you should verify the currency
of the information above using the ASSIST Online database at https://assist.daps.dla.mil.
14
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business