
MIL --- PRF --- 51525B
First article sample
(19 gas filters)
Contractor's quality inspections
including leakage testing
Filters shipped to Gov't
Interface, ID markings, workmanship inspections
airflow resistance
Shock
Vibration
Rough
Hot/cold
Structural
Corrosion
Emission
handling
temperature
deformation
(salt fog)
test and
(Qty 3)
(Qty 3)
analysis
(Qty 6)
(Qty 2)
(Qty 2)
(Qty 1)
(Qty 2)
Airflow resistance,
Airflow resistance,
Airflow resistance,
Airflow resistance,
DMMP gas life
DMMP gas life
DMMP gas life
DMMP gas life
FIGURE 2. First article inspection sequence
11
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business