MIL --- PRF --- 51525B
shall then be tested for airflow resistance and leakage. Following airflow resistance, leakage
testing of sample filters, and moisture content testing of adsorbent material, sample filters shall
be packaged using the same methods, materials, equipment, and processes as will be used dur-
ing regular production. Packaged filters shall then be forwarded to the Government for rough
handling and additional tests. Any packaged sample filters forwarded to the Government shall
be protected from moisture in the air. Requirements and verification methods are cross refer-
enced in Table I.
4.2.3 Acceptance criteria. If any first article sample item fails to comply with any of the ap-
plicable requirements, the first article sample shall be rejected.
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business